Message

School Project Experience


Schools

  • MATC Science Lab Renovation; Client: Milwaukee Area Technical College
  • MATC Medical Stimulation Lab; Client: Milwaukee Area Technical College
  • MATC Health & Science Center; Client: Milwaukee Area Technical College
  • MATC DMC Fitness Center & Faculty Innovation Center Remodeling; Client: Milwaukee Area Technical College
  • MATC Specialty Bake Lab; Client: Milwaukee Area Technical College
  • DMA Cuisine Fine Dining Lab & Dining Room Renovation; Client: Milwaukee Area Technical College
  • MATC Oak Creek Campus Culinary Arts Skills Lab Renovation; Client: Milwaukee Area Technical College
  • Mary McLeod Bethune Academy; Client: Milwaukee Public Schools

MATC Science Lab Renovation

Toki & Associates provided Construction Management services for the remodel of two science labs and two prep areas for use in Chemistry and Biology courses.  Included in the project were demolition of existing facilities (floor removal, underground plumbing and electrical) masonry cutting and patching, structural modifications, new mechanical equipment including a rooftop unit and Energy Recovery Unit, plumbing, electrical, carpentry and casework, and all new finishes. Work was done on a tight schedule allowing less than three months start to finish.


MATC Medical Stimulation Lab

Toki & Associates provided Construction Management services for this state-of-the-art Medical Simulation Lab was designed and built with hospital rooms, a nurse’s station, and conference room to closely imitate the hospital environment. The high-tech simulation mannequins required specialty connections and very detailed installation.


MATC Health Science Center

Toki & Associates provided key services for this MATC Addition Project (Health & Science Center). As experts in this field, we provided civil, electrical, and structural design of this project.

With the structural engineering service we not only provided the building structural design, we also designed the skywalk that connected the “H” building (Health & Science Center) to technical and industrial building. The electrical power distribution was designed to accommodate future moves and furniture relocation. Our civil engineers provided a complete and through site design that provided functionality and efficiency for this project.

 

MATC DMC Fitness Center & Faculty Innovation Center Remodelin

Toki & Associates provided Construction Management services for this state-of-the-art Video Conference Classroom and Faculty Innovation Center. The project included demolition of offices and classrooms to create a new video conference classroom as well as other classrooms and offices. Due to the nature of faculty usage, phasing was required to relocate portions of the offices and perform work in a strictly controlled environment and a tight schedule.


MATC Specialty Bake Lab

Toki & Associates provided Construction Management services for the remodel of an existing baking lab and classrooms to create a state-of-the-art baking lab.  This project included demolition of existing facilities, structural modifications, mechanical, plumbing, electrical, carpentry, kitchen equipment, and all new finishes. Work was done on a tight schedule allowing less than three months start to finish.

 

MATC DMA Cuisine Fine Dining Lab & Dining Room Renovation

Toki & Associates provided Construction Management services for the remodel of the existing swimming pool area to a new Fitness Center.  Included in the project were demolition of existing facilities and structural foam infill of the swimming pool, structural modifications, new mechanical, plumbing, electrical, carpentry and casework, and all new flooring finishes. Work was done on a tight schedule allowing less than three months start to finish.

 

MATC Oak Creek Campus Culinary Arts Skills Lab Renovation

Toki & Associates provided Construction Management services for the remodel of an existing kitchen facility to a state-of-the-art culinary skills laboratory.  This project included demolition of existing facilities, mechanical, plumbing, electrical, carpentry, kitchen equipment, and all new finishes. Work was done on a tight schedule allowing less than three months start to finish.

 

Mary McLeod Bethune Academy

This program called for building a new school, parking lot and play areas, and underground retention pond below soccer field. Toki & Associates, in association with Pace Architects, provided survey, civil design. As surveyors we verified and located all current site features and boundaries. Our civil engineers were able to design the site to meet local requirements for playground, parking areas, and storm sewer, also all sewer major utilities per City of Milwaukee requirements.

 
copyright@2011
facebook facebook twitter